Steelglass Pools Remodeling.

 

A safe, quick, guaranteed system

There are many reasons to remodel your pool:

 

1. technical problems, generally caused by technical failures of the sealing system that the customer decides to solve.

 

2. the customer wants to remodel the pool even if there aren’t sealing problems

 

Steelglass offers to you the remodeling service, valid for all existent constructive systems and a definitive solution

Basically it can be divided in two parts:

 

-concrete structure with ceramic tilings

-liner and pvc film

 

Normally the process is the same: it will be applied a special adhesive to the PVC membrane to seal the pool and finally, the ceramic tiling, with a 25 years guarantee.

 

If your pool has a concrete structure with ceramic tilings, we must substitute all the filtering elements like skimmers, booster, drains with the double PVC sealing. Estetically are identical but, the double sealing membrane offers a best sealing.

If your pool has already had liner or PVC film, the substitution process is unnecessary because we have just to remove the existent liner or pvc membrane. 

Let’s transform your old liner pool in a new stoneware pool!

1/5
Process 1: Substitute all filtering elements.

 

 if your pool has a concrete structure with ceramic tilings, we must substitute all the filtering elements like skimmers, booster, drains with the double PVC sealing. Estetically are identical but, the double sealing membrane offers a best sealing.

 

 If your pool has already had liner or PVC film, the substitution process is unnecessary because we have just to remove the existent liner or pvc membrane. 

1/4
2.  Process 2. Optional acces construcction 
 

Now it´s time to choose an optional access construction and change water dephts

Now we can decide to construct or not an internal access or relax area. 

1/5
Process 3. The sealing membrane.

 

Once cleaned, a special PVC membrane (1,3 mm thikness) is secured to its foundations thanks to a special adhesive provided by steelglass  

1/6
Process 4. Stoneware installation.

 

At the end we apply our bt300 adhesive that, not only will create a second sealing membrane but it’s also used as glue for the last coating, the ceramic wall tilling. 

1/7
Process 5. Grouting and filling the pool.

 

Once the grouting operation is complete, the pool shall be filled.

You can enjoy your pool, as if it were the first day, including a new 25 years lasting sealing guarantee with other colours, measures, with stairs… without limits!